High-priority Charlestown proposal. City agenda materials identify QLevr LLC, a 3 MW facility at Shadow Lake Business Park, a $105 million real-property budget, $100 million personal-property installation estimate, and estimated local tax impacts. Water and utility records still need review.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source lead: City economic-impact summary estimates $2.14 million in first-year real and personal property taxes, $11.22 million total tax liability over ten years, and no modeled personal-property tax abatement savings. Incentive agreements, TIF/allocation-area documents, and infrastructure-cost records still need review.
Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing. The public economic-impact summary confirms project scale and site but does not document water demand.
Power
Source lead: City economic-impact materials identify a proposed 3 MW data center, and DCD describes the 12-acre Shadow Lake Business Park site. Utility feed, upgrade-cost, interconnection, tariff, and ratepayer records still need review.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.