High-priority Google/Panattoni Project Cannoli proposal in Van Buren Township. Township planning records document the preliminary site-plan path for three data-processing buildings and a substation; the campus-scale power lead remains separate from DTE's broader generation partnership and from confirmed IT load.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.
Water
Source reviewed September 9, 2026: Van Buren Township's preliminary site-plan materials identify three data-processing buildings, a network-service building, a water-services building, and stormwater ponds, but the reviewed public record does not establish a water-service quantity, cooling withdrawal, consumption, or wastewater capacity.
Source reviewed September 9, 2026: Van Buren Township's February 11, 2026 agenda records the preliminary site-plan request for three data-processing buildings and a substation; Panattoni describes a Fortune 50 cloud/data-processing use, while reporting identifies Google as the end user. DTE's separate 2.7 GW clean-resource partnership is grid-generation context, not this campus's load. The dataset's 1,000-2,700 MW remains proposed project/power context, not confirmed requested, approved, energized, generation, or data-center IT-load capacity.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.