The map should grow from repeatable source ingestion, not one-off pins. This queue tracks the bulk sources, precision rules, and verification steps needed to move from 4,464 curated and baseline records toward a real national facility census.

4,464current records
902IM3/OSM baseline imports
1,313FracTracker-derived imports
1,349ATLAS location leads
796PeeringDB facility leads
4k-5k+external U.S. facility estimates
10candidate rows staged
1dedupe decisions
7,527coordinate backlog leads

Import schema

Every source row should land in this shape before it becomes a public map pin.

sourcesource_urloperatorfacility_namealias_or_shell_companycitycountystate_or_provincecountrylatitudelongitudelat_lng_precisionstatusproject_typecapacity_mwconfidencemoney_record_statusnda_statuslast_verified_date

Candidate rows

These are not public map pins yet. They are staged rows that need dedupe, category decisions, and public-record links before promotion.

0ready to review
publishedmedium confidence

Colossus 2

xAI · Shelby, Tennessee

Precision
county
Status
operating
Capacity
1,563 MW
Dedupe
high
Money: needs recordsNDA: source foundWater: needs recordsPower: source found

Promoted as a project-level marker while retaining the broader Memphis Colossus record for NDA and community-impact context.

Source
needs dedupemedium confidence

Colossus 1

xAI · Shelby, Tennessee

Precision
county
Status
operating
Capacity
300 MW
Dedupe
high
Money: needs recordsNDA: source foundWater: source foundPower: source found

Held for dedupe because the existing Memphis Colossus marker already covers the original xAI site and NDA record.

Source
publishedmedium confidence

IREN Childress

IREN · Childress, Texas

Precision
county
Status
operating
Capacity
750 MW
Dedupe
low
Money: not startedNDA: not startedWater: needs recordsPower: source found

Promoted from candidate after operator confirmation of the 750 MW Childress AI-optimized data center.

Source
publishedmedium confidence

Riot Platforms Rockdale

Riot Platforms · Rockdale, Texas

Precision
county
Status
operating
Capacity
700 MW
Dedupe
low
Money: not startedNDA: not startedWater: needs recordsPower: source found

Promoted after Riot confirmed the 700 MW Rockdale facility supports Bitcoin mining and data center operations.

Source
publishedmedium confidence

EdgeCore Mesa PH03

EdgeCore · Mesa, Arizona

Precision
city
Status
operating
Capacity
450 MW
Dedupe
medium
Money: needs recordsNDA: not startedWater: needs recordsPower: source found

Promoted as a distinct EdgeCore Mesa marker while preserving the broader Mesa cluster marker.

Source
publishedmedium confidence

Fairwater B1 / MKE03

Microsoft · Racine, Wisconsin

Precision
county
Status
operating
Capacity
338 MW
Dedupe
medium
Money: source foundNDA: source foundWater: needs recordsPower: source found

Promoted as a distinct Fairwater/MKE03 marker and kept tied to Wisconsin NDA and state incentive follow-up.

Source
publishedmedium confidence

Phoenix I-VII

Stream Data Centers · Phoenix, Arizona

Precision
metro
Status
operating
Capacity
280 MW
Dedupe
medium
Money: needs recordsNDA: not startedWater: needs recordsPower: source found

Promoted as Stream's Goodyear/Phoenix campus after operator confirmation of the 280 MW full-build campus.

Source
publishedmedium confidence

King Mountain

Hut 8 · Upton, Texas

Precision
county
Status
operating
Capacity
280 MW
Dedupe
low
Money: not startedNDA: not startedWater: needs recordsPower: source found

Promoted with visible caveat that it is a crypto/HPC-adjacent large-load digital infrastructure site.

Source
publishedmedium confidence

San Antonio III-VII

Stream Data Centers · San Antonio, Texas

Precision
metro
Status
operating
Capacity
280 MW
Dedupe
medium
Money: needs recordsNDA: not startedWater: needs recordsPower: source found

Promoted after operator and local announcement sources confirmed Stream's third San Antonio campus.

Source
needs recordshigh confidence

National air-permit import batch

Multiple · Multiple, Multiple

Precision
exact facility
Status
unknown
Capacity
unknown
Dedupe
medium
Money: not startedNDA: not startedWater: not startedPower: source found

Represents BI's 1,240-row air-permit based dataset. Needs row access/extraction before individual map candidates can be created.

Source

Funding

tax_exemptionabatementtif_or_bondutility_upgradeschool_revenue_impact

NDA / secrecy

confirmed_ndanda_requestedshell_companypublic_records_dispute

Water

daily_gallonswater_sourcewastewater_planreuse_claimpermit_url

Power

capacity_mwannual_twhbackup_generatorsinterconnectionratepayer_risk
P0Investigation

Business Insider U.S. data center investigation

1,240 built or approved U.S. data centers by end of 2024

FacilityManual extractionHigh when facility is tied to air permits, ownership, electricity estimates, and local jurisdiction.Import state-by-state rows first, then join to company shells and power estimates.
Open source
P0Directory

Cloudscene United States market directory

5,427 American data centers

FacilityNeeds access reviewUse as coverage benchmark and facility candidate source; verify each facility with operator or local record.Assess accessible rows, terms, and whether a licensed/exported dataset is needed.
Open source
P0Directory

DataCenterMap USA directory

4,767 data centers across 50 states

FacilityNeeds access reviewCandidate facility rows require source URL, operator, state, and precision tag before map import.Profile state pages and build a dedupe key against current records.
Open source
P0Directory

Baxtel United States directory

5,154 U.S. data centers; global dataset reports 10,900+ facilities

MixedNeeds access reviewUse facility-level rows where exposed; treat locked/sample-only metrics as non-importable until licensed.Profile accessible pages by state/operator and queue facility rows with Baxtel URL provenance.
Open source
P0Infrastructure map

Cleanview / US Data Center Map

Operating, planned, and under-construction projects with capacity where reported

ProjectReady to profileHigh for named projects with capacity, developer, status, year, and county/state.Import large-capacity operating/planned projects first, especially those with power MW fields.
Open source
P1Infrastructure map

dcmap.us

4,713 U.S. facilities across 52 states and territories, 346 GW built/building/announced

MixedReady to profileUse as cross-check against Cloudscene/Baxtel/DataCenterMap and to identify missed high-capacity sites.Compare state/operator counts with our map and create missing-site batches.
Open source
P1Infrastructure map

NREL / national data center energy map coverage

More than 4,000 U.S. data centers in a November 2025 snapshot

MixedReady to profileUse as energy-infrastructure cross-check; import only rows with retrievable source data.Find original NREL/Lab source layer and check whether data is downloadable.
Open source
P1Operator

Google official data center locations

30 active worldwide locations; some have more than one data center site

Metro/regionOperator batchOperator-confirmed location; exact site count remains unknown unless local/project records identify separate campuses.Replace Google region rows with local facility records where possible.
Open source
P1Operator

Meta U.S. data center locations

Meta-listed U.S. data center fleet

ProjectOperator batchOperator-confirmed campus; local incentive and utility records still required.Add missing Meta locations and tie each to local tax/infrastructure records.
Open source
P2Operator

AWS global infrastructure

AWS regions, availability zones, and edge network locations

Metro/regionOperator batchDo not treat AWS region/edge markers as exact facilities unless corroborated by permits or local records.Use as cloud-market layer only; facility import requires permit/local source.
Open source