Site Snapshot
- Location
- Port Washington, Wisconsin
- Operator / sponsor
- Vantage Data Centers / OpenAI / Oracle reporting
- Status / stage
- Proposed · proposal
- Scale
- $8B to $15B-scale proposal reported in 2026
Proposed-site record
Public reporting has framed Port Washington as a major flashpoint in Wisconsin's data center backlash and subsidy debate.
A local referendum required public approval for large tax subsidies on future projects.
Residents raised water, tax, and infrastructure questions.
Large AI workload demand expected.
Reported secrecy
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.
These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.