Proposed-site record

Mountaineer Gigasystem/ Monarch Cloud Campus

Crowdsourced lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

ProposedconfirmedMedium concern

Site Snapshot

Location
Point Pleasant, Mason County, West Virginia
Operator / sponsor
Fidelis/Nscale
Status / stage
Proposed · utility / power
Scale
2000-8000 MW reported; Mega campus (>1,000 MW); 2250 acres; expected online 2028

Water

Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.

Power

Source dataset reports 2000-8000 MW; power source: Coal, Natural gas, Biomass; dedicated power plant: Yes - Brightloop Hyrogen Plant / Monarch. Utility tariff, interconnection, and ratepayer records need separate sourcing.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, Water, PowerAttached fields: Public money
Draft request for missing recordsSubmit evidenceReport correctionDiscuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.