Site Snapshot
- Location
- Point Pleasant, Mason County, West Virginia
- Operator / sponsor
- Fidelis/Nscale
- Status / stage
- Proposed · utility / power
- Scale
- 2000-8000 MW reported; Mega campus (>1,000 MW); 2250 acres; expected online 2028
Proposed-site record
Crowdsourced lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Source dataset project_cost field reports $5 billion; public funding records still need local review.
Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.
Source dataset reports 2000-8000 MW; power source: Coal, Natural gas, Biomass; dedicated power plant: Yes - Brightloop Hyrogen Plant / Monarch. Utility tariff, interconnection, and ratepayer records need separate sourcing.
No NDA reported
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.
These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.