Site Snapshot
- Location
- Chatham, Pittsylvania County, Virginia
- Operator / sponsor
- Balico LLC
- Status / stage
- Blocked or paused · blocked / paused
- Scale
- 3500 MW reported; Mega campus (>1,000 MW); 4,752,000 sq ft; 763 acres
Proposed-site record
PEC lead with medium location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Source dataset project_cost field reports $3.7 billion; public funding records still need local review.
Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.
Source dataset reports 3500 MW; power source: Natural gas; dedicated power plant: Yes - Pittsylvania power station. Utility tariff, interconnection, and ratepayer records need separate sourcing.
No NDA reported
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.
These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.