Proposed-site record

Google Abernathy Data Center

Media Monitoring lead with low location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

ProposedconfirmedMedium concern

Site Snapshot

Location
Abernathy, Hale County, Texas
Operator / sponsor
Fluidstack/TeraWulf/Google
Status / stage
Proposed · utility / power
Scale
168-240 MW reported; Hyperscale (100-999 MW); 120 acres; expected online 2026

Water

Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.

Power

Source dataset reports 168-240 MW. Utility tariff, interconnection, and ratepayer records need separate sourcing.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, Water, PowerAttached fields: Public money
Draft request for missing recordsSubmit evidenceReport correctionDiscuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.