Fermi America HyperGrid/ Project Matador

Media Monitoring lead with medium location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

Under constructionconfirmedHigh concern

Site Snapshot

Location
Amarillo, Carson County, Texas
Operator / sponsor
Fermi America and Texas Tech
Status / stage
Under construction · under construction
Scale
11,000-17,000 MW reported; Mega campus (>1,000 MW); 18,000,000 sq ft; 5769 acres; expected online 2026

Data Fields

NDA / secrecyMissing / needs review
Public moneyMissing / needs review
WaterMissing / needs review
PowerMissing / needs review

Public Money

No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.

Water

Source dataset reports cooling source: Water; cooling type: Closed loop. Water permits and withdrawal records need local sourcing.

Power

Source dataset reports 11,000-17,000 MW; power source: Natural gas, Nuclear, Solar. Utility tariff, interconnection, and ratepayer records need separate sourcing.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, Public money, Water, PowerAttached fields: none yet
Draft request for missing recordsSubmit evidenceReport correctionDiscuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.