Site Snapshot
- Location
- Aliquippa, Beaver County, Pennsylvania
- Operator / sponsor
- Five 9s Digital/Fezzik Energy
- Status / stage
- Proposed · utility / power
- Scale
- 496 MW reported; Hyperscale (100-999 MW); 250,000 sq ft; 86 acres
Proposed-site record
Media Monitoring lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Source dataset project_cost field reports $25 billion; public funding records still need local review.
Source dataset reports cooling source: Water. Water permits and withdrawal records need local sourcing.
Source dataset reports 496 MW; power source: Natural gas, Grid (unspecified mix); dedicated power plant: Yes - 2 248 MW natural gas power plants. Utility tariff, interconnection, and ratepayer records need separate sourcing.
No NDA reported
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.
These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.