Proposed-site record

Project Hummingbird

Crowdsourced lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

Under constructionconfirmedHigh concern

Site Snapshot

Location
Greensboro, Greene County, Pennsylvania
Operator / sponsor
Essential Utilities/ International Electric Power of Pittsburgh
Status / stage
Under construction · under construction
Scale
900-1000 MW reported; Mega campus (>1,000 MW); 1400 acres; expected online 2028

Data Fields

NDA / secrecyMissing / needs review
Public moneyMissing / needs review
WaterMissing / needs review
PowerMissing / needs review

Public Money

No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.

Water

Source dataset reports cooling source: Water. Water permits and withdrawal records need local sourcing.

Power

Source dataset reports 900-1000 MW; power source: Natural gas; dedicated power plant: Yes - Greene County Power Island; 2 generators. Utility tariff, interconnection, and ratepayer records need separate sourcing.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, Public money, Water, PowerAttached fields: none yet
Draft request for missing recordsSubmit evidenceReport correctionDiscuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.