Site Snapshot
- Location
- Warren, Trumbull County, Ohio
- Operator / sponsor
- Bristolville 25 Developer LLC
- Status / stage
- Proposed · utility / power
- Scale
- 1500 MW reported; Mega campus (>1,000 MW)
Proposed-site record
Media Monitoring lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Source dataset project_cost field reports $3.6 billion; public funding records still need local review.
Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.
Source dataset reports 1500 MW; power source: Grid (unspecified mix), Biomass. Utility tariff, interconnection, and ratepayer records need separate sourcing.
No NDA reported