Under constructionconfirmedHigh concern

Site Snapshot

Location
Santa Teresa, Doña Ana County, New Mexico
Operator / sponsor
Open AI/Oracle
Status / stage
Under construction · under construction
Scale
700 MW reported; Mega campus (>1,000 MW); 3,000,000 sq ft; 1400 acres; expected online 2026

Public Money

Source dataset project_cost field reports $165 billion; public funding records still need local review.

Water

Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.

Power

Source dataset reports 700 MW. Utility tariff, interconnection, and ratepayer records need separate sourcing.

Missing Water, PowerAttached fields: NDA / secrecy, Public money
Draft request for missing recordsSubmit evidenceReport correctionDiscuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.