Proposed-site record

Nixxy-Tachyon 9 Data Center

Media Monitoring lead with low location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

ProposedconfirmedMedium concern

Site Snapshot

Location
Epping, North Dakota
Operator / sponsor
Unknown operator
Status / stage
Proposed · utility / power
Scale
1000 MW reported; Mega campus (>1,000 MW); 620 acres; expected online 2027

Water

Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.

Power

Source dataset reports 1000 MW; power source: Natural gas, Hybrid (onsite and grid). Utility tariff, interconnection, and ratepayer records need separate sourcing.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, Water, PowerAttached fields: Public money
Draft request for missing recordsSubmit evidenceReport correctionDiscuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.