Proposed-site record

Geronimo Power Data Center

Media Monitoring lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

Blocked or pausedconfirmedMedium concern

Site Snapshot

Location
Reading, Murray County, Minnesota
Operator / sponsor
Unknown operator
Status / stage
Blocked or paused · blocked / paused
Scale
400-500 MW reported; Hyperscale (100-999 MW); expected online 2030

Data Fields

NDA / secrecyMissing / needs review
Public moneyMissing / needs review
WaterMissing / needs review
PowerMissing / needs review

Public Money

No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.

Water

Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.

Power

Source dataset reports 400-500 MW; power source: Hybrid (onsite and grid). Utility tariff, interconnection, and ratepayer records need separate sourcing.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, Public money, Water, PowerAttached fields: none yet
Draft request for missing recordsSubmit evidenceReport correctionDiscuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.