Site Snapshot
- Location
- Lovejoy, Clayton County, Georgia
- Operator / sponsor
- Stillwater
- Status / stage
- Blocked or paused · blocked / paused
- Scale
- 1250 MW reported; Mega campus (>1,000 MW); 3,465,000 sq ft; 400 acres; expected online 2031
Proposed-site record
Media Monitoring lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Source dataset project_cost field reports $13 billion; public funding records still need local review.
Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.
Source dataset reports 1250 MW. Utility tariff, interconnection, and ratepayer records need separate sourcing.
No NDA reported
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.
These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.