Site Snapshot
- Location
- Rincon, Effingham County, Georgia
- Operator / sponsor
- Open AI
- Status / stage
- Proposed · utility / power
- Scale
- 3200 MW reported; Mega campus (>1,000 MW); 2600 acres; expected online 2028
Proposed-site record
Media Monitoring lead with medium location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Source dataset project_cost field reports $30 billion; public funding records still need local review.
Source dataset reports cooling type: Closed loop. Water permits and withdrawal records need local sourcing.
Source dataset reports 3200 MW; power source: Grid (unspecified mix). Utility tariff, interconnection, and ratepayer records need separate sourcing.
No NDA reported
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.
These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.