Site Snapshot
- Location
- Harlem, Columbia County, Georgia
- Operator / sponsor
- Cloverleaf Infrastructure
- Status / stage
- Proposed · utility / power
- Scale
- 500 MW reported; Hyperscale (100-999 MW); 2,870,400 sq ft; 420 acres
Proposed-site record
Media Monitoring lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.
Source dataset reports cooling source: Water; cooling type: Closed loop. Water permits and withdrawal records need local sourcing.
Source dataset reports 500 MW; power source: Hybrid (onsite and grid); dedicated power plant: Yes - Georgia Power. Utility tariff, interconnection, and ratepayer records need separate sourcing.
Reported secrecy
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.
These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.