Site Snapshot
- Location
- Sterling, Logan County, Colorado
- Operator / sponsor
- Granite Renewables
- Status / stage
- Proposed · utility / power
- Scale
- 2000 MW reported; Mega campus (>1,000 MW); 4198 acres
Proposed-site record
Media Monitoring lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Source dataset project_cost field reports $15 billion; public funding records still need local review.
Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.
Source dataset reports 2000 MW; power source: Hybrid (onsite and grid). Utility tariff, interconnection, and ratepayer records need separate sourcing.
No NDA reported
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.
These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.