Proposed-site record

Prime Data Center

Media Monitoring lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

Under constructionconfirmedMedium concern

Site Snapshot

Location
Tolleson, Maricopa County, Arizona
Operator / sponsor
Prime Data Centers
Status / stage
Under construction · under construction
Scale
240 MW reported; Hyperscale (100-999 MW); 1,300,000 sq ft; 66 acres

Water

Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.

Power

Source dataset reports 240 MW. Utility tariff, interconnection, and ratepayer records need separate sourcing.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, Water, PowerAttached fields: Public money
Draft request for missing recordsSubmit evidenceReport correctionDiscuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.